Stage 1: Capability check before sampling

Confirm that the supplier can read the drawing, build a bill of materials, identify critical characteristics, and explain connector availability and alternatives. Ask for the process route, inspection items and packaging method used on similar products. A supplier that can only show sample photos, without a process explanation, usually carries a higher production risk.

Stage 2: Sample validation

The first article is not only a visual check. Verify wire sequence, lengths, branch positions, terminal crimp, connector retention and labels against the drawing. Run continuity, short-circuit, insulation and dielectric tests as specified. Record crimp height, pull force and strip length. After approval, retain a signed sample together with the drawing, bill of materials, process settings and inspection plan.

Stage 3: Factory audit

An audit looks for evidence, not a logo on the wall: incoming inspection records, traceability of terminals and wire, tooling and equipment checks, first-article and patrol inspection, segregation of nonconforming parts, customer notification of changes, calibration of test equipment, and packaging/label consistency with the approved sample. For high-mix low-volume work, also check changeover efficiency and scheduling flexibility.

Stage 4: Production transfer

Freeze the drawing and material revisions, approve alternate components, fixtures, work instructions, inspection plan and packaging specification, and agree on first-article approval, lot sampling, deviation feedback and change notification. On repeat orders, verify material lots and process settings so the production build stays consistent with the approved sample.

Onboarding checklist

  • Drawing, bill of materials and critical-characteristic list
  • Sample test records and signed sample
  • Process route, work instructions and inspection plan
  • Incoming, in-process and outgoing inspection records
  • Change notification and deviation handling agreement
  • Packaging, label and transport validation

Use this checklist item by item; it is a better indicator of long-term fit than unit price alone. For the manufacturing scope, see custom wire harness manufacturing.

Get a Quote Back to List