Workstation Assembly Sequence and Error-Proofing Verification for Part Pickup: Sampling, Sequence Check, Wrong Part Interception and Judgment
Boundary Verification and Sampling
The objects of verification are the assembly process sequence, part retrieval actions, and barcode scanning confirmation at the final assembly workstations. The goal is to ensure that operators work in accordance with the order specified in the drawings and process documents, that incorrect parts are intercepted by error-proofing devices or barcode scanning actions, and that first-piece inspection and abnormal rework follow the established procedures. Samples cover assembly batches from different product models, different workstations, and different shifts, recording work order numbers, workstation codes, product models, assembly times, and operators. Sampling conditions are determined according to the verification plan, and they are not extended to the entire production line based on a single workstation or single product type. Verification does not alter the normal assembly process, and the selected operations are checked on-site by an observer. Verification status, deviations, and interception actions are fully documented, and only after confirming accuracy does the workflow continue.
Assembly Sequence and Process Verification
Process verification is based on assembly process documents and work instructions, confirming each process step by step that the previous step is completed before proceeding to the next: steps such as presetting, plugging, snapping, fastening, and re-inspection are executed in the order specified by the documents, without skipping, combining, or reversing steps. During verification, stand by the workstation according to the cycle time, recording the start and completion time of each step, the jigs used, and the batch numbers of materials. If skipping steps, cross-step operations, or sequence deviations such as fastening before plugging are discovered, stop immediately and return to the previous step to redo, without carrying deviations into the next workstation. The version of the process document, workstation number, and verification results are recorded in the batch record according to the documents.
Error Prevention in Picking and Wrong Item Interception
Error-proof picking verification includes checking the correspondence between the material box slots and the process materials, whether incorrect materials are blocked by structural limits or barcode scanning, and whether multiple items or mixed materials are detected before picking. Materials are picked one by one according to the model, specification, and quantity marked in the process documents, without crossing slots or casually taking materials from adjacent slots. If the wrong model, wrong specification, multiple items, or mixed packaging is found, the slot and material are recorded on the spot, staying at the current process for rechecking. Intercepted materials are returned to the previous workstation or rack for reconfirmation and are not assembled further. Error-proof devices, slot markings, and material status are recorded according to the process documents, and manual bypassing of error-proof measures is not allowed.
Scan code to confirm and judge
Scanning confirmation is carried out after each key process is completed by scanning the material barcode or work order barcode. The system compares the material model, quantity, and process sequence according to the process documents. The first-piece inspection is conducted by the inspector, who checks the appearance, proper insertion, fastening status, and error-proofing marks against the drawings and process documents. Only after confirming that the first piece is qualified can subsequent batches proceed. If any scanning result does not match the process documents, required materials are missing, the sequence is reversed, or the first piece is unqualified, an interception is triggered, and the workpiece will not be released and will be sent back to the previous process. Judgments are conducted according to the criteria specified in the validation plan, and if a key item is unqualified, the current validation is deemed failed; the qualification of individual pieces does not imply the qualification of the entire batch.
Batch Records and Reverification
Record the work order number, workstation number, product model, sampling quantity, sequence check results, number and type of pick-up interceptions, scanning records, first-piece judgment conclusions, and abnormal rollback situations to form traceable batch records. After verification, check whether error-proofing devices, scanning equipment, process document versions, and workstation layout are still consistent with the site. After changes in assembly processes, parts box configurations, scanning logic, or workstation layout, re-organize verification and do not use previous conclusions. The assembly execution and error-proofing practices at the final assembly workstation can be found in Wiring Harness Final Assembly Station Execution and Error-Proofing Process: Assembly Sequence, Error-Proofing of Part Picking, Scan Code Confirmation, and First Piece Confirmation.