Test scope: what is and is not verified

This test verifies the force curve when a terminal enters the housing, the holding ability of primary and secondary latches, and latch condition after a defined number of mating cycles. It does not replace contact resistance, sealing performance or housing material validation. Before testing, confirm connector family, cavity, terminal batch and test direction.

Sampling: connectors and terminals from one batch

Sample housings and terminals from the same batch, complete crimping and assembly to drawing, and discard samples with cosmetic damage, distortion or mixed material. Identify samples by cavity number, pin definition and insertion direction. Condition them in the specified environment before testing, and avoid hand sweat or oil affecting force values.

Insertion-force measurement: speed, direction and curve

Insert at constant speed along the cavity axis with a push-pull gauge or materials tester, record the force-displacement curve, and read peak and steady-state values. The fixture must grip the housing wall without damaging the latch or terminal. Zero the instrument before each test, and use a fresh sample for repeated measurement of the same cavity so repeated insertion does not alter latch condition.

Latch-retention verification: primary and secondary latches

After full seating, check the visible state of primary and secondary latches, then apply a pull force in the withdrawal direction and confirm no backout within the specified force window. For housings with secondary latches, verify conditions before and after latching. After the specified number of mating cycles, recheck latch, retainer and housing face for cracks, whitening or permanent deformation.

Disposition: limits, records and isolation

Judge against the force window in the drawing and control plan, and record peak, steady-state, latch state and cycle count. If force is out of window, a terminal backs out, a latch fails or the housing is damaged, isolate the batch and trace housing, terminals, crimping and assembly station. See connector insertion and latching process.

Get a Quote Back to List